Kathmandu Terai Expressway

Nijgadh–Kathmandu corridor (Fast Track)

The Kathmandu–Terai/Madhesh Expressway (Fast Track) is a 70.977 km national corridor (48.037 km road, 12.885 km bridges, 10.055 km tunnels) where SWEPL supplies structural steel, TMT bar, pipe, and sheet across infrastructure packages under Nepal Army delivery.

WhatsAppMessage on WhatsApp
Structural steel and reinforcement materials supplied by Steel Wood Nepal for the Kathmandu–Terai Expressway (Fast Track) infrastructure corridor, Nijgadh to Kathmandu

Flagship programmes at this scale consume reinforcement, plate, and tubular steel continuously. SWEPL’s Birgunj import hub and Terai godowns feed Nijgadh–Kathmandu transit lines; roughly 30% of works were reported complete as of mid 2024, with a revised completion outlook toward 2026.

Material scope supplied

  • Structural steel, TMT reinforcement, HR/GI pipe, HR sheet
  • Bridge and tunnel package steel across 70.977 km corridor
  • Multi package infrastructure supply, ongoing programme

Standards

IS 2062, IS 1786, IS 3589, MoR/DoR project specs